TOWN OF

David D.
Costanzo, Highway Superintendent
Established
1792
February Highway Maintenance Report
·
Removed snow from
the Town Hall and the following roads:
o
Alexander,
·
Plowed and sanded
– 9 times
·
Salted the school
parking lots – 3 times
·
Continued work on
Truck #8
o
Rebuilding dump
body
·
Worked with the
Town of
·
Replaced signs
town-wide
·
Patched pot holes
town-wide
·
Cleaned up after
wind storm
·
Cut brush
·
Replaced damaged culvert
on
·
Cleaned culverts
·
Town-wide
inspection for warm weather
Scheduled March Highway Maintenance
·
Cut brush
·
Plow as needed
·
Finish work on
Truck #8
·
Post roads for
4-ton weight limit