May Highway Maintenance Report
·
Started screening
gravel
·
Started work on
·
Started mowing
the Towns’ ROW’s
·
Hauled 325 loads
of winter sand from the pit to the Highway Department
·
Installed 45 mph
signs on
·
Ditched
·
Installed “Field
Closed” signs at the recreation fields
Scheduled June Highway Maintenance
·
Continue road
work on
·
Continue mowing
the ROW’s (town-wide)
·
Continue to
screen gravel
·
Excavate and top
soil the circle at the Town Hall.