TOWN OF

David D.
Costanzo, Highway Superintendent
Established
1792
March Highway Maintenance Report
·
Plowed and sanded
as needed (out 8 times)
·
Winter
maintenance on equipment and trucks
·
Finished sign
survey
·
Patched pot holes
town-wide
·
Picked up two(2),
International Dump Trucks from Federal Surplus
·
Started sweeping
roads
·
Cut brush
town-wide
·
Posted 4-ton,
weight limit signs on all town roads
Scheduled April Highway Maintenance
·
Finish sweeping
·
Start screening
sand and gravel
·
Start using brush
hog attachment on mowing tractor