TOWN OF

David D.
Costanzo, Highway Superintendent
Established
1792
January Highway Maintenance Report
·
Finished overhead
cutting on
·
Started overhead cutting
on
·
Plowed &
sanded as needed (out 19 times)
·
Winter
maintenance on trucks and equipment
·
Started sign
survey
·
Put up “All-Way”
signs at 4-way stop locations
February Highway Maintenance
·
Plow and sand as
needed
·
Continue overhead
cutting on
·
Continue sign
survey